Walthamstow Reservoirs, Walthamstow

SESEs Walthamstow Reservoirs contract was under the direction of Barhale. Contracted for management only SESE helped supervise the removal of Zebra Mussels from some of Thames Waters main London water supply tunnels. In some places these mussels had reduced the water capacity by over 50%. With over 20 miles of 2.4m diameter pipe discharging raw…

Harmondsworth

Brought in as management only, SESE were contracted to look after numerous external works packages. SESE's proactive approach to promoting teamwork was notably effective as the subcontractors under our direction were able to improve their output ensuring all parties would benefit from this project. SESE managed the construction of the four main courtyards, a football…

Terminal 5, heathrow

SESE were contracted to T5 by Strongforce on a management only engineering contract. Here we managed the works of a number of different teams relocating over 7,000 beam, slab and distribution post tensioned tendons. SESE were called because many of the projects tendons had not been grouted during the initial construction process; Strongforce under their…

Straightjacket Studios, Chiswick

Our responsibilities on British Grove, Chiswick included communications with the client, district surveyors, consultants, architects and subcontractors, together with the setting out. Built for the famous eighties rock band Diastraights, Straightjacket studios was an excellent design and build achievement considering the space that all involved had to work with. The way each of the 3…

Beadles Range Rover, Sidcup

As external works managers SESE were brought in by LSC Contractors to get the severely delayed ground works programme back on track. Again this was achieved successfully with our clients more than happy with the work produced. SESE were heavily involved with the installation of the new road pictured everything from setting out the entire…

Bannatyne Fitness Centre, Chingford

As the site engineers our flexible role included communications with the district surveyor, designers and subcontract managers, on top of the engineering and setting out for the entire project. Brought in to help save a project that was fast going wrong, SESE were contracted by Tolent to take over the site engineering as of the…

Tower Hamlets HAT, Bow

Built on a brownfield site this 25% affordable housing project was designed to rejuvenate a particularly run down part of Tower Hamlets, and now provides 252 units of both private and affordable housing. Featuring numerous curves, angles and a unique atrium feature, Block E proved to be an Bow_Image1.jpg excellent challenge as the block given…

BAA/VAA Hangar and Harmondsworth D.C.

As part of an established Interserve team SESE were given the task of managing both internal and external works packages, all of which were for the envelope of the two story offices sharing a party wall with the hanger itself; this hanger as one of the largest open span hangers in the world was build…

Newlon Housing Trust, Murray Grove/Commercial Road

SESE's responsibilities at Murray Grove included all site engineering, steel call-offs, concrete orders, labour returns, site instructions, management progress meetings, architect, consultant and third party contractor communications. Contracted to engineer the building of this reinforced concrete frame, this Newlon Housing Trust project demanded a high level of engineering and management with the ability to supervise…

UCL Anthropology, Euston

This project was an extension to the Department of Anthropology at University College London. Here SESE were responsible for the supervision of all external works packages including Ground work, Asphalting, Cladding and Curtain wall packages. The most involving feature of this part new build part refurb project was its new build Pod. Built on the…